 |
Brandon VT

Painting trim. |

Assembling interior structural framwork.

|
Installing sheething to spire |
 |
 |
Using a crane to load steeple onto
a flatbed for
transport to site. |
Preparing lantern section for siding. |

Steeple is on site and prepared
for installation
|

Steeple loaded and ready for transport.

|
 |
Church belfry being repaired and
made ready
for lantern and spire.

|
Finished lantern and spire being
installed on belfry. |
| |
Job complete! |
| |
|